Installing Starter Shingles On Rake

Installing starter shingles on rake Trim 6 1/2 inches off the rake of the starter course shingle and overhang the drip edge along the rake and eaves edge, 1/4 to 3/4 inch, and continue across the roof. Will allow a smooth and uniform transition for applied shingles. Place the shingle so that it is flush with the starter course with the start course over hanging the eave or drip edge by 1/4” to 3/4”. The starter strip is also required to be secured with 5 fasteners, placed 2 or 3 inches up from the eaves edge. Starter shingle roll along a clean, dry and smooth eave line or rake edge, after removing the release sheet.apply the starter shingle roll directly onto the weatherlock® underlayment or a layer of felt. When laying your shingles, butt them tight against each other as you move down a row. Place it beneath each shingle against the drip edge; Place the thermal sealing adhesive toward the eave edge. The blade should be facing up. Remember in high wind areas install a leak barrier along the rakes for added protection, and install starter shingles up the rake.


Pinnacle Pristine Hp42 Installation Diagram 4 Roof Shingles Pinnacles Architectural Shingles

Easy application application is a snap too. If no drip edge is used, shingles If the exposure is greater than 6, a full starter (15½ x 393⁄ 8) would be required. Starter strip plus shingle can extend no greater than 3⁄ 4 beyond the edge of the eave. Apply remaining 131 ⁄4 x 20 piece, followed by full 131 4 x 40 pieces along the eave. Use 5 fasteners for each shingle, placed 2 to 3 inches up from eaves edge.

Installing starter shingles on rake. Starter strip plus shingle eliminates the need to cut off tabs or headlap. A superior alternative to starter shin. It’s easy for a single person to. When separated, each starter shingle is 65⁄ 8 x 393⁄ 8, and each bundle will cover approximately 100 lineal feet. The starter strip on the roof is incorrectly installed. This starter can be used with shingles that have an exposure of no more Choose an outer edge to begin laying your shingles. Tom melillo, residential project manager, roof services: Use an owens corning® starter product. Without the starter course, water would run. Starter strip plus shingle starter strip plus shingle advantages: Align starter shingle roll with eave & rake edge granular side up with the seal strip closest to the outer edge of the roof. Speeds installation and helps improve safety. Do not remove the perforated top section. The main reason for a starter course is to fill the gaps between the keys on the shingles. Shingle installation begins with starter shingles that are installed along the eave and rake edges. (see application instructions on back.) the starter shingle roll advantages: The adhesive strips should be facing upwards. A simpler and very useful purpose for using starter shingles along the rake edge is that it gives the installer a nice straight line to use as a guide when ending each course of the field shingles. This starter can be used with shingles that have an exposure of no more than 6; Once the material is up on the roof, they can move on to the starter course. Control line and nail them down, four nails per shingle. Once it is pressed into place, you’re ready to begin shingling.

Use four nails on these starter shingles as shown on field shingle product wrap. Start fi rst starter strip plus shingle with 6 removed from the rake edge and fl ush with the drip edge. The shingle manufacturer requires a starter strip to be installed along the eaves. Place the second shingle next to the first. Install a course (row) of starter shingles along the eaves and rakes with roofing nails according to the manufacturer’s instructions, aligning them correctly with the drip edge on the eaves and rakes. Extend the shingles over the rake and eaves about 1⁄2 (13 mm) if drip edge is used, or about 3⁄4 (19 mm) if no It is imperative that you keep the starter row square to the roof. So, when observers look up at the roof gable ends , they’ll see an aesthetically pleasing uniform line rather than ragged and uneven shingle ends. You may need to trim the first starter shingle to establish the correct joint stagger with successive courses of shingles. Then, slide the hook knife in your direction and it will score the bottom of the shingle. Installation of starter strip shingle starter strip shingle is designed to be broken into two pieces, and each piece has its own sealant strip. This product eliminates the need for cutting shingle tabs or inverting them to create a starter row. After applying the starter shingles at the eaves, but prior to installing the field shingles, starter shingles may be applied up the slope at the rake edge with sealant facing out and nearest to the outer roof edge. Then continue across the roof. You will completely cover the starter row with roofing shingles and create an 1/8” lip over the rack edge. For rake application, install drip edge first before applying. Remember, the sealant on starter courses. Lay starter shingles so the top edge butts against the lower edge of the second course of the existing roof. Cut 20 off the first bottom piece. Remove release backer and press to assure full adhesion to the underlayment.


Pin On Roof Details


How To Build A Lean To Shed Complete Step-by-step Guide Lean To Shed Shed Design Shed Roof


Provided The Fraction Isnt Smaller Than The Minimum Offset As It Is On This Roof This Is An Aesthetic Issue And Is Roofing Roof Installation Roof Problems


How To Shingle A Roof Diy Roofing Roofing Diy Roofing


Cedar Roof Installation - Shake Shingles Cedar Shake Roof Cedar Roof Installing Roof Shingles


Cedar Shake Installation - Watkins Sawmills Ltd Cedar Shake Roof Wood Shake Roof Cedar Shakes


Roofing Buying Guide Roofing Diy Roofing Buying Guide


How To Repair Ten Of The Most Common Roofing Problems - Or How To Avoid Them Altogether Roof Problems Roofing Fine Home Building


Subscribe to receive free email updates:

0 Response to "Installing Starter Shingles On Rake"

Post a Comment